CategoriesLinearSpecialistRotaryGreenAbssac

Shaft coupling saves fish

Shaft coupling saves fish
The Challenge was to develop a flexible shaft coupling that could be used in the drive assembly of a “Aerator” used in the oxygenation of water in fish spawning ponds and small lakes. Aeration is especially required in times of hot weather where the oxygen concentration within the water can fall and have a detrimental effect...
Monday 4th May 2020

ABSSAC's Virtual Exhibition 2020

ABSSAC's Virtual Exhibition 2020
Take a few moments to look at our virtual and interactive exhibition, where no hand sanitiser or social distancing will ever be required.  Stay Home, Keep Safe. Follow this link . . . . .
Monday 30th March 2020

JOSCAR approval

JOSCAR approval
ABSSAC achieves full approval to the accreditation register - JOSCAR ( Joint Supply Chain Accreditation Register). The register is used by the aerospace, defence and the security industry to act as a single repository for pre-qualification and compliance information.
Monday 23rd March 2020

Satellite roller screws

Satellite roller screws
There are many ways of transferring a rotational force into a linear one, particularly in the world of linear translation devices.  Such devices include the simple lead screw and plastic nut and the industrial standard recirculating ball screw device.
Wednesday 18th March 2020

Satellite roller screws

Satellite roller screws
There are numerous ways of transferring a rotational force into a linear one, particularly in the world of linear translation devices.  Such devices include the simple lead screw and plastic nut and the industrial standard recirculating ball screw device.
Tuesday 3rd March 2020

Using the 23 Asilomar AI Principles?

Using the 23 Asilomar AI Principles?
Challenges are always better faced with a partner and ABSSAC can supply innovative rotary component connections or Linear precision through its lead and ball screw ranges. Our goals are to provide engineering solutions by offering outstanding value backed by attentive and committed service.
Friday 21st February 2020
x
check for webp support